The road from a purely reactive program to a RCM program is not an easy one. The following is a list of some basic steps that will help to get moving down this path.
1. Develop a Master equipment list identifying the equipment in your facility.
2. Prioritize the listed components based on importance to process.
3. Assign components into logical groupings.
4. Determine the type and number of maintenance activities required and periodicity using:
a. Manufacturer technical manuals
b. Machinery history
c. Root cause analysis findings - Why did it fail?
d. Good engineering judgment
5. Assess the size of maintenance staff.
6. Identify tasks that may be performed by operations maintenance personnel.
7. Analyze equipment failure modes and effects.
8. Identify effective maintenance tasks or mitigation strategies.
From Operations & Maintenance Best Practices - A Guide to Operational Efficiency July 2004
Blog Archive
-
▼
2010
(61)
-
▼
June
(12)
- Defibtech DBP-2800 Battery Packs used in Lifeline ...
- Gear Down, Cool Down
- Always Check your SCBA
- Federal Ruling on High Visibility Vests
- Reactive Maintenance
- Preventive Maintenance Programs
- Predictive Maintenance Program
- Reliability Centered Maintenance Program
- How to Initiate Reliability Centered Maintenance
- Truck Company Operations - SCBA Donning Drill
- Truck Company Operations - SCBA Donning Drill #2
- SCBA Donning Drill
-
▼
June
(12)
Real Kings of Logistics
Monday, June 14, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment